Client : Whyte Orthodontics

Whyte Orthodontics

Project : Two building refurbishment
Design : Mark Floate

Premis delivered a whole building refurbishment of this commercial building including full interior and exterior refurbishment of two dilapidated buildings located on the same block.

Six new tenancies including Whyte Orthodontics were created with internal walls and ceiling works undertaken.   Mechanical, electrical and hydraulics were also re-installed throughout the building.  High-end finishes were also used throughout with areas of glass bricks to provide ‘light and shade’ throughout.

Architect, Mark Floate introduced impressive architectural features including the refurbishment of the façade, which now provides a real street presence.

Let's have a chat

LET'S START