Client : Griffith University

Allied Health Refurbishment, Griffith University

Project : Allied Health Refurbishment
Design : Conrad Gargett

Works were recently completed on the six-storey N55 building at Griffith University, Nathan campus.   The reburbishment involved upgrades to the upper three levels of the building, construction of an internal stair structure to connect each floor and a new-build portion on the roof podium.

The project was completed in two stages to minimise disruption to staff and students and to the running of the everyday operations of the University.   Stage 1 consisted of the construction of the new roof and half of the upper floor, the full floor plate of the middle floor and around 30% of the lower floor.

The second stage included the refurbishment of the upper floor and 70% of the lower floor, including installation of the linking stairwell to all floors, as well as an upgraded elevator.

Project works were undertaken concurrently across all levels of the building with demolition, structural work and fitout being undertaken to fast-track the project.