15 Mar, 2017 | Written by Premis

Premis Project: Griffith University Laboratories

Premis was recently engaged to complete a comprehensive laboratory project at the Griffith University, Nathan campus. The project involves the delivery of six laboratories across four buildings under a construction management contract, and the refurbishment of a large office space.

The Premis team commenced work on this project in May 2016 and five of the six specialist laboratories, including two PC2 laboratories, one chemical laboratory and one analytical laboratory have been delivered. The office accommodation is currently under refurbishment and the sixth laboratory is in design mode. The sixth laboratory is the largest of the group and is being purpose-built as the location for pioneering scientific research.

This program has navigated a number of occupancy challenges that are inherent in live environments, as well as building alongside existing structures and constructing laboratories that were located above classrooms and university facilities.

This project is due to be completed in August 2017.

 

Tags: comprehensive laboratory projectconstruction management projectrefurbishment

Let's have a chat

LET'S START