Premis Solutions Pty Ltd

PH: (07) 3870 5566
FAX: (07) 3871 2076

EMAIL:
solutions@premis.com.au

ADDRESS:
Suite 2A
530 Milton Rd
Toowong QLD 4066

POST:
PO Box 114
Toowong QLD 4066

BSA License No: 1088822

Projects & Client Testimonials

Premis has successfuly completed projects for a wide variety of clients across a range of sizes, budgets, specifications and construction environments. Following is a snapshot of Premis’ client list.

Read what our clients have to say about Premis in the project details below.

Corporate - RACQ, AXA Australia,V8 Supercars, Mater HR Department, Queensland Investment Corporation, Exxon, AMP, Uniting Care, Stocklands, Pandemic Studios, Steelforce, Mitchell Media, George Patterson, Babcock and Brown, Maquarie Bank, Davies Knox Maynard, Knight Frank, Jones Lang LaSalle.

Education - QUT, Griffith University, University of Queensland, Russo Institute, Alphatykes

Queensland Government - Project Services, Child Safety, Wide Bay TAFE, Department of Industry Tourism & Resources, Department of Education & Training, Brisbane Entertainment Centre, Legal Aid,  Youth Justice Services, Corrective Services, Main Roads, Queensland Rail, Energex, Department of Communities, Emergency Services.

Commonwealth Government – Centrelink, Austrade, Australian Hearing, Ministerial & Parliamentary Services, Medicare, CSIRO, Australian Taxation Office, Australian Electoral Commission, Commonwealth Law Courts..

Additionally Premis performed the role of Construction Manager for Technology One/Avand in 2007, Caltex at Port of Brisbane in 2008, NMI in 2010 and others.

Premis is experienced in completing projects in occupied premises while the client continues normal business operations.

Some notable projects are detailed below incorporating testimonials from our valued clients.


steel close up

National Measurement Institute

Premis measures up in Geebung

Location: National Measurement Insititute
Project: 33 Kingtel Place, Geebung
Architect: IA Group
Size: 1300m²
Timing: 10 weeks
Key achievement: Flexibility and timing were crucial in this project.

Read more....


ia lunch room

IA Group

Recent office refurbishment

Location: Level 4, 303 Adelaide Street
Project: Office refurbishment

See photos....

 


lab close up

Griffith University N48

Student Collaborative Zone

Location: Griffith University, Nathan Campus
Project: N48 Student Collaborative Zone
Architect: Arklab
Size: 133m²
Timing: 12 weeks
Key achievement: Detailed programming and on-site coordination meant minimal disruption for the client.

See photos....


lab close up

Laboratory, Griffith University

Making it easy is in Premis’ DNA

Location: Griffith University, Nathan Campus
Project: N55 Environmental Forensics Laboratory
Architect: Phillips Smith Conwell
Size: 400m²
Timing: 12 weeks
Key achievement: High levels of communication ensured a smooth construction process and services coordination to meet technical laboratory standards — while staying within a very tight budget.

Read more....


QUT A Block

QUT A Block

Premis achieves tops marks in QUT heritage building

Location: A Block, Gardens Point Campus.
Client: QUT.
Size: 1300m² over 3 floors
Timing: September 2009
Key achievement: Cooperation and teamwork ensured effective design detail and services installation in a heritage building. A well-finished modern fitout was completed on time and with minimal disruption to university activities.

Read more....


UQ Social Sciences

UQ Social Sciences

Premis delivers the detail

Location: Social Sciences Faculty
(Room 307), St Lucia Campus.
Client: Design Nest.
Size: 70m²
Timing: May 2009
Key achievement: Sharing the vision for the project with the architect ensured the intent was realised with a high quality result.

Read more....


Caltex at the Port of Brisbane

Caltex – Port of Brisbane

Premis collaborates well with fellow contractors on complex Caltex office fitout

Location: 3 Sandpiper Ave, Fisherman’s Island.
Client: Architectus (Angela Lamb).
Size: 900m²
Timing:  January 2008
Key achievement: Working collaboratively with another contractor. Maintaining a high standard of communication and ensuring the smooth dovetailing of all efforts.

Read more....


Centrelink Office fitout

Centrelink

Tight turnaround no problem for Premis

Location: Over 14 customer service centres throughout Queensland and
Northern NSW
Client: IA Group and previously Interior Dynamics
Timing:
 Average 1 week on site
Key achievement: Completing an entire refit of the government centre
in less than a week.

Read more....


RACQ Office fitout

RACQ

Relationship with RACQ in high gear as Premis drives million-dollar fitouts

Location: Cnr Logan Road & Levington Road, Eight Mile Plains.
Client: MBS Architects (Lew McLennan - now Gray Puksand MBS).
Size: 1300m² (Bldg 4) and 800m² (Bldg 5)
Timing:  November 2006 (Building 4) and October 2007 (Building 5)
Key achievement: Quality planning ensured disruption to client was limited.

Read more....


Department Tourism Office fitout

Department of Industry Tourism & Resources

A lasting impression makes another happy client

Location: Level 9, 100 Creek Street,
Brisbane CBD.
Client: Interiors Australia (Milena Butovski).
Size: 800m²
Timing: February 2008
Key achievement: Professional approach ensured work ran smoothly,
despite last minute changes to the project plans.

Read more....


Uniting Care Brisbane Office fitout

Uniting Care

Going the extra mile for Uniting Care fitout

Location: 193 North Quay, Brisbane CBD.
Client: Adentro Design (Kelly Tuck).
Size: 700m² (Lvl 8) and 900m2 (Lvl 5)
Timing: January 2007 (Lvl 8) and
November 2007 (Lvl 5)
Key achievement: Working intuitively and proactively to display impressive
problem-solving ability.

Read more....

Back to top

meeting client expectations

At the end of each project Premis asks clients to complete a satisfaction survey, which covers a range of key delivery topics.

Attendance to defects
Project quality
Kept informed
Solutions provided
Ease of doing business with
Completion on time

Premis team members constantly strive to improve levels of service across all of these areas.

This year we have significantly improved our process and results for attendance to defects and project quality while maintaining 100% 'would recommend Premis to others'.


The Premis Promise: On-time commercial fitouts

DIRECTOR'S MESSAGE

“Time and time again I see a project that's been allocated an expected delivery time. But when I analyse it, I see that it just can't work. I talk to the client and suggest other ways to get things done—but we still do our best to get things done within that timeframe."

Rod Phillips
Managing Director
Premis Solutions



DIRECTOR'S MESSAGE

“Of course, the ability to do the job is important. But having the financial capacity to do the work is ESSENTIAL to a positive outcome for our clients.”

Brad Stringfellow
Director of Finance
Premis Solutions